Kakuda Solar Power Plant
Feature
This is a project that has been developed by Kakuda Electric Fuel Development LLC, which was established by Kakuda Solar Energy, a general incorporated association funded by WWB Corporation. The power plant is expected to produce an annual planned consumption of approximately 20,319 MWh which is equivalent to the power consumption of approximately 4,150 ordinary households, and an annual CO2 reduction of approximately 11,800 tons.
Business entity | Kakuda Electric Fuel Development Co. |
---|---|
Power plant name | Kakuda Solar Power Plant |
Location | Aza-dai, Oda, Kakuda City, Miyagi Prefecture |
Site area | 610,630㎡ |
Power generation scale (DC) | Approx. 18.3MW |
Operation start date | March 2021 |
Carbon dioxide reduction (tons) | 11,800tons |
Average annual electricity consumption of a typical household (for households) | For 4,150 households |
- The amount of carbon dioxide reduction (tons) and the average annual power consumption of general households (per household) are calculated by applying the following coefficients based on the expected annual power generation amount.
Standards for CO2 reduction :417.5g-CO₂/kwh
Average annual power consumption of general household: 4,892kwh/year
(Reference)Japan Photovoltaic Energy Association Guidelines 2020 version