Kuranami Solar Power Plant

Business entity WWB Corporation
Power plant name Kuranami Solar Power Plant
Location Sodegaura City, Chiba Prefecture
Site area 24,022㎡
Power generation scale (DC) Approx. 1.1MW
Operation start date March 2022
Carbon dioxide reduction (tons) 800tons
Average annual electricity consumption of a typical household (for households) For 300 households
  • The amount of carbon dioxide reduction (tons) and the average annual power consumption of general households (per household) are calculated by applying the following coefficients based on the expected annual power generation amount.

    Average annual power consumption of general household: 4,573kwh/year
    Standards for CO2 reduction :399.5g-CO₂/kwh
    (Reference)Japan Photovoltaic Energy Association Guidelines 2021 version